Cable Diagram - Vectra Fitness On-Line 1650 Owner's Manual

Table of Contents

Advertisement

Vectra On-Line
Note: The pulleys on this diagram are numbered
to make the installation of new cables as easy as
possible. Simply start threading the cables through
the pulleys beginning with the lowest number and
working up. For example, If you are installing an
entire set of cables, start at pulley #1. If you are
installing only a new ab/leg cable (PN 52750),
you would begin at pulley #20.
Note: Where applicable, text and other drawings
in this manual that mention or show pulleys
contain corresponding numbers.
Step 2, Cable
Adjustment.
See #21 (last page).
PN 52750
LEG
Note:
Leg/Calf Press
option cable is
PN 61000.
Step 3, Cable
Adjustment.
See #21 (last
page).
19
PN 52740
AB
20
22
21
17
18
16
23
3/8-16 x 1/2
1/4-20 x 3/4
Hex Bolt
Hex Bolt
PN 55870
PN 20850
®

1 650 Cable Diagram

4
3
8
9
10
7
12
14
15
13
1/2
Shaft Retainer
PN 17750
2
1
HIGH
PULLEY
PN 52760
PN 28840
PN 57790
11
6
Step 1, Cable
Adjustment.
Ball must touch
slot below it.
See #21 (last
page).
Plastic
1/2-13 x 1
Hole Plug
Button Head
PN 13790
PN 27990
15"
EXTENSION
CABLE
PN 57820
5
LOW
PULLEY

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents