Electrical Connections - Biasi RIVA COMPACT HE M96.24SM/C2 User Manual And Installation Instructions

Wall hung, fan flue, room sealed, high efficiency gas boiler
Table of Contents

Advertisement

Installation
For M96.32SM/...
Equivalent length
(air duct + flue duct)
Between 1 and 24 m
Tab. 6.2
Vertical--- roof kit (Fig. 6.9)
This kit allows vertical termination of the flue pipe
through the roof. The kit is 1.2 m in length. Exten-
sion pieces (Co--- axial) are also available which al-
lows the flue system to be extended to a total
overall maximum permissible length.
Optional 45û and 90û elbows can be used to offset
the flue route.
Each additional elbow reduces the overall accept-
able length of the flue system as follows:
45û reduce length by 0,5 m.
90û reduce length by 1 m.
max =8,5 m
Only for M96.32SM/...
max = 6 m
Fig. 6.9
6.9

Electrical connections

Connection to the electricity supply
1 Remove the front panel of the case (see the
section 9.2 in this manual).
2 Remove the screws I and J (Fig. 6.10).
3 Loosen the screws K.
Restrictor
ø 50 mm
Fig. 6.10
4 Remove the side panels or move the lower part
90û=--- 1 m
45û=--- 0,5 m
Fig. 6.11
5 Loosen the screws L and remove the service
J
K
of the side panels as indicated in Fig. 6.11 and
pull the control panel.
When completely pulled out, the panel can ro-
tate 45û downwards to facilitate the operations
on the internal parts.
panel (Fig. 6.12).
I
J
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents