Tools And Materials Required; Remove The Packaging - GE ZV950 Installation Instructions Manual

36" stainless steel vent hood
Hide thumbs Also See for ZV950:
Table of Contents

Advertisement

Installation
Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
° Tape measure
° Knife
° Spirit level
• Wire cutter/stripper
• Wire nuts
• Electric drill with 1/8" and 3/8" bits
• Phillips and flat blade screwdrivers
• Hammer
• Pliers
• Safety glasses
° Duct tape
° Tape to mount template
° Gloves to protect against sharp edges
° 120V 60Hz. 15 or 20 Amp, 2 wire with ground.
Properly grounded branch circuit.
° Strain relief for junction cover.
° 8" round metal duct, length to suit installation.
REMOVE THE PACKAGING
The hood is shipped secured to o shipping board with (4)
screws. Remove the 8 screws. Two screws ore located at
the top of the hood. Two ore located at the bottom of the
hood behind the grease filters.
A shipping bracket, which supports the blower, must also
be removed. It is secured with two screws. All screw im-
pressions ore Phillips.
• Remove oll packaging, the duct covers, and accessories.
• Lift the hood out of the carton.
• Remove and properly discord oil plastic wrapping.
Top Of Hood
d
Screwsand ShippingBracket
• Removejunction box cover.
• Install strain relief into junction box cover.
/
-/
/
/
Junction
Box
V
TopShippingScrews

Advertisement

Table of Contents
loading

Table of Contents