Download Print this page

Tools Needed; Materials Needed - Bosch SHE44C07UC/22 Installation Instructions Manual

Advertisement

Tooms and Matedams
Needed
TOOLS
NEEDED
Hammer
\
Hob Saw
Tape Measure
Sbt Screwd river
PhHHpsScrewdriver
%20 Screwdriver
Wire Cutter
Wire Stripper
DrHU
LeveU
MATERIALS
NEEDED
(AdditionaU materiab may be required to compUy with UocaU codes,)
EbctrbaU SuppUyCabb ° Minimum #14 AWG, 2 conductor, 1 ground, insuUated copper
conductors rated 75°C or higher,
Hot Water Supply Line - Minimum 3/8" O,D, copper tubing or metal braided dishwasher
supply line,
Shut-off valve and fittings appropriate for hot water supply line (copper tubing/
compression fitting, or braided hose),
90 ° elbow with 3/8" N,RT, male threads on one leg, and sized to fit your water supply
line (copper tubing/compression
fitting, or braided hose) on the other leg,
Teflon tape or other pipe thread compound to seal plumbing connections,
UL listed conduit connector or strain relief,
2

Advertisement

loading