Placing The Unit Out Of Service For A Planned Stoppage Or Breakdown; Placing The Unit Out Of Service For Planned Stoppage; Placing The Unit Out Of Service For Seasonal Stoppage; Placing The Unit Out Of Service Due To A Fault - York Activa Series User Manual

Roof top air conditioners
Table of Contents

Advertisement

1.7 Placing the unit out of service for a planned stoppage or
breakdown.

1.7.1 Placing the unit out of service for planned stoppage

To stop the air conditioning unit using the DPC-1 ther‐
mostat, press the MODE, -1- key repeatedly until the
following appears: OFF, -2-.

1.7.2 Placing the unit out of service for seasonal stoppage

The power supply to the unit must be disconnected when placing the air conditioning unit out of service
for long periods of time (seasonal stoppage).
To do so, the differential circuit breaker and thermal magnetic switch on the unit power supply must be
disconnected.
C A U T I O N
Always keep the electrical power supply connected to the unit.
Only disconnect the unit if it is not to be used for a long period of time.
When preparing for seasonal use, connect the unit to the electricity supply at least 8 hours before
starting it.

1.7.3 Placing the unit out of service due to a fault

If the air conditioning unit is faulty, its self-diagnostics
system will identify the source and the pilot light -1-
on the display of the DPC-1 thermostat will switch on.
The display will also show a two-digit number on the
lower left -2-indicating the effected component.

Placing the unit out of service for a planned stoppage or breakdown.

User manual
1
1.7
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Activa

Table of Contents