WARNING: ELECTRIC SHOCK HAZARD! Installation of this appliance should be performed by qualified service
personnel only. Improper installation could result in electrocution.
SET-UP AND POSITIONING OF BREWER
• Remove the brewer from packaging material and attach legs.
• Position the brewer on a strong, stable table or counter. Check the level front to back and side to side. Adjust legs as necessary to level
the unit.
WATER AND ELECTRICAL CONNECTIONS
IMPORTANT:THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE FOR ENSURING THAT ELECTRIC AND WATER
CONNECTIONS MEET THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, NATIONAL PLUMBING CODE AND ANY LOCAL
ORDINANCES.
The water and electrical connection locations are behind the front panel on the right side of the brewer. Remove the screws fastening this panel
to the unit to access these connections.
WATER HOOK-UP
• The water line may enter the brewer through holes in the bottom or rear of the brewer.
• Use 3/8" copper tubing or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection to the fill valve
is 3/8" flare.
• Water line pressure should be between 30 and 70 psi.
• Hot (up to 160°F) or cold water may be supplied to the unit. Hotter water will allow faster recovery between brews.
ELECTRICAL POWER SUPPLY HOOK-UP
• The electric ratings for this brewer are printed on the nameplate attached to the unit. Always see the name plate for rating information for
the particular brewer.
• The brewer should be connected to its own dedicated circuit with a fused disconnect switch or circuit breaker near the brewer.
• Attach the appropriately sized cord to the brewer with a cord grip for the 1-1/8" electric input opening in either the rear or bottom of the
unit. Use an oil resistant cord such as type SO, SOO, SAO, STOO, SEO, SJO, SJOO, SJTO, SJTOO, SJEO, HSO, HSOO, HSJO or
HSJOO. Alternatively, flexible conduit and type THHN wires may be used. Use only copper conductors.
• Standard units are single element units and are wired internally for single phase, 3 wire service. Connect the neutral line to the N terminal
of the terminal block and the 2 conductors to L1 and L2 of the terminal block. 3 element units may be connected to single or 3-phase
service. 3 element, single-phase units should be connected as described above. For 3 element units intended to operate with a 3 phase
power supply, connect the third phase conductor to L3 of the terminal block.
• The body of the brewer must be grounded. Connect the ground conductor to the ground lug located near the terminal block.
WARNING: ELECTRIC SHOCK HAZARD! Never use the ground conductor as a neutral. This could cause
electrocution.
INITIAL START-UP
• Turn on the water supply to the brewer. Check for leaks at the supply line to fill valve connection. Remove the controller cover panel.
• Turn on the electrical power. The brewer will begin to fill. Units that require more than 5 min. to fill will display an error message "ER1" on
the controller after 5 min. of filling. Press the SELECT button on the controller for 10 sec. to reset the unit and continue filling. To reset the
controller, the SELECT button must be pressed while the LED's indicate ER1. If the SELECT button is momentarily pressed a timer
numerical value will be displayed. If this occurs, wait 10 sec. and the error message will again be displayed; press the SELECT button for
10 sec. to reset controller and resume filling.
• After the tank has filled, replace the controller cover panel.
• Turn on power and the water heating cycle will begin; it will take 15-35 min. to complete the heating cycle. The WATER HOT light on the
front of the unit will turn on when the water has reached temperature.
• The brewer can now be operated to evaluate brew timer settings and then make adjustments as necessary.
The brewer timers settings are preset at the factory to the following values:
Small brew
(0.75 gal.)
Medium brew
(1.25 gal.)
Large brew
(1.75 gal.)
• Insert the brew baskets and place the appropriate container under the brew basket.
• Portion size is selected with the touchpad located on the front of the brewer. The upper right hand area of the touchpad has 2 LEDs. If
both are lit the unit is set to brew the large volume. If only the upper LED is lit, the brewer will brew the medium volume; if only the lower
LED is lit, the brewer will brew the small brew volume.
ICB-400, ICB-300, P-430,
P-330, RAP-430, RAP-330,
RAPS-430, RAPS-330
INSTALLATION
120 sec.
165 sec.
230 sec.
OPERATIONS MANUAL

Advertisement

Table of Contents
loading

Summary of Contents for Grindmaster ICB-300

  • Page 1 If only the upper LED is lit, the brewer will brew the medium volume; if only the lower LED is lit, the brewer will brew the small brew volume. ICB-400, ICB-300, P-430, P-330, RAP-430, RAP-330,...
  • Page 2 AMERICAN METAL WARE ® INITIAL START-UP (cont’d) Once the appropriate selection is made, press the START switch on the touchpad to begin dispensing water through the sprayhead. Brew at least 1 batch for each timer setting. Check the level in the container to be sure the brew volume is correct. Remember that when using coffee, the level will be lower than it will be when using water only.
  • Page 3: Operation

    TEMPERATURE AND BREW TIMING CONTROLS (Refer to Figure C) Temperature and brew timing are set by the dial and keypad located on the main controller. This controller is positioned inside the brewer housing and is accessed by removing the screws which fasten the access panel to the brewer. The controller stores 6 independent brew timer values.
  • Page 4 AMERICAN METAL WARE ® STANDARD FEATURES Three options are available on this equipment; these options are available independently of each other. The features are described below: Pre-infusion: This option enables the brewer to wet the grounds and then have a dwell period before the brew cycle is completed. This option causes the brew valve to open for a period of time, close for an equal period of time and then open again for completion of the brew.
  • Page 5: Care And Cleaning

    BYPASS ADJUSTMENT (Refer to Figure D) The bypass valve adjusts the amount of water that bypasses coffee grounds and dilutes the final brew. The factory setting is no bypass. Bitter coffee results when the amount of ground coffee is too small. Therefore, if coffee is too strong, it is better to adjust the bypass rate instead of reducing the amount of coffee.
  • Page 6: Troubleshooting Guide

    AMERICAN METAL WARE ® The following pages are provided to help determine the cause of problems with operation of the brewers and to indicate the appropriate solution for the problems. For each problem, the possible cause should be checked in the order shown until the exact nature of the problem is determined. The following procedures must be performed by a qualified service technician.
  • Page 7: Heating Problems

    TROUBLESHOOTING GUIDE (cont’d) Problem Tank does not refill (cont’d) • No electrical power to equipment. Tank does not heat • No power to control board. • High electrode coated with lime or faulty. • Connection from control board to tank body faulty.
  • Page 8: Brewing Problems

    AMERICAN METAL WARE ® Problem Tank does not heat (cont’d) Brew recovery time is very long Brew volume too large or too small Brew volume erratic NOTE: Small variations from batch to batch are normal. Brew cycle will not start Page 8 BREWERS TROUBLESHOOTING GUIDE (cont’d)
  • Page 9 If you still need help, call our service department at (800) 568-5715 (Monday through Friday, 8 am - 6 pm EST) or an authorized service center in your area. Please have the model and serial numbers ready so that accurate information may be given. Prior authorization must be obtained from Grindmaster Corporation’s Technical Services Department for all warranty claims. AMERICAN METAL WARE TROUBLESHOOTING GUIDE (cont’d)
  • Page 10 A531-073 A535-071 A535-059 A536-018 A537-129 A537-154 A554-101 A712-066 A712-170 A712-174 Page 10 BREWERS P-430, P-330, ICB-400, ICB-300 A530-051 A712-170 A712-174 A712-066 A537-129 A531-072 DESCRIPTION Relay, 12V d.c. Coil Controller Relay, Power, 115V Coil Switch, Red Stop Element, Heating 6.6kw 240 Vac Element, Heating 6.6kw 240 Vac...
  • Page 11 AMERICAN METAL WARE BREWERS ® NOTES Page 11...
  • Page 12: General Warranty Information

    Metal Ware products. We use the finest components and materials, and employ quality engineering standards and tests. Models ICB-400, ICB-300, P-430, P-330, RAP-430, RAP-330, RAPS-430, RAPS-330 Brewers will be warranted for a period of one year from date of shipment. This warranty will include parts and labor but will not cover transportation and shipping charges and will be limited to equipment sold to commercial purchasers and installed in the continental U.S.A., Hawaii, Alaska and Canada.

This manual is also suitable for:

Icb-400P-330P-430Rap-330Rap-430Raps-330 ... Show all

Table of Contents