Instruction for the Installer

The following instructions about installation and maintenance must be carried out by
qualified personnel in compliance with the regulation in force. The regulation to be
applied for this type of installation is NBN D 5I.003 : "Installations functioning with
combustible gas lighter than air".
The side walls of the unit in which the hob is going to be installed, must not exceed
the height of the working top.
Avoid installing the appliance in the proximity of inflammable materials (e.g. curtains,
tea towels etc.).
The appliance must be electrically disconnected before all interventions. If any
electric supply to the appliance is required to carry out the work, ensure all the
necessary precautions are followed.
Gas connection
It is indispensible that the connection to the gas mains are carried out by means of an AGB tap.
Choose fixed connections or use a flexible pipe in AGB (stainless steel).
If using flexible metallic pipes, be careful they do not come in contact with mobile parts or they
are not squeezed. Use the same attention when the hob is combinated with an oven.
This hob can be operated by Slochteren gas (G25) with a nominal pressure of 25 mbar or by
natural gas with nominal pressure of 20 mbar. No regulation is required for use by these two types
of gas. Before fitting the appliance ensure that the
installation has the correct voltage for the appliance.
At full capacity, the drop in pressure must not exceed
5%. Such a drop in pressure is caused by the
following parameters:
-
maximum capacity of meter;
-
diameter and lenght of the tube in front and
behind the meter;
-
section of transit of variuos tubes positioned on
the circuit;
-
diameter of eventual connections.
IMPORTANT - To ensure a correct operation, a
saving of energy and the long-life of the appliance,
the voltage pressure of the appliance must correspond
to the recommended values.
The adjustable connection is fixed to the
comprehensive ramp by means of a threaded nut G 1/2".
All the components shown in Fig.4 have already been assembled in the factory.
The appliance, before leaving the factory, has been tested in order to give you the best results.
44
FO 2365
A) Ramp with ending nut
B) Seal
C) Adjustable connection
Fig. 4