It is necessary that you install a double pole
switch between the oven and the electricity
supply (mains), with a minimum gap of 3mm
between the switch contacts and of a type suitable
for the required load in compliance with the
current rules.
The switch must not break the yellow and green
earth cable at any point.
The yellow and green earth cable should be 2-3
cm. longer than the other cables.
Important
After installation and connecting, the cable must
be placed so that it cannot at any point reach a
temperature of more than 50°C above the ambi-
ent temperature.
Before the oven is connected, check that the
main fuse and the domestic installation can
support the load; and that the power supply is
properly earthed.
The manufacturer disclaims any responsibility
should these safety measures not be carried
out.