2.2 Boiler location

The unit's combustion chamber is sealed
off from the installation room and therefore
requires no compartment ventilation.
The installation room must be sufficiently
well ventilated to prevent any dangerous
conditions from forming in the event of even
slight gas leakage. This safety standard is
required by the EEC Directive no. 90/396 for
all gas units, including those with a so-called
sealed chamber.
Therefore the place of installation must be
free of dust, flammable materials or objects
or corrosive gases. The room must be dry
and not subject to freezing.
The boiler is designed to be installed on a
solid wall. The wall fixing must ensure a stable
and effective support for the appliance, using
the bracket and fixings supplied.
If the unit is enclosed in a cupboard or
mounted alongside, there must be space
for normal maintenance work. Fig. 9 and
tab. 1 give the minimum clearances to leave
around the unit.
fig. 9
Safe Handling of Substances
Care should be taken when handling the boiler
insulation panels, which can cause irritation to the skin. No asbestos, mercury or CFCs are included in
any part of the boiler.
Product Handling Advice
When handling or lifting always use safe techniques - keep your back straight, bend your knees, don't
twist - move your feet, avoid bending forwards and sideways and keep the load as close to your body
as possible.
Where possible transport the boiler using a sack truck or other suitable trolley.
Always grip the boiler firmly, and before lifting feel where the weight is concentrated to establish the
centre of gravity, repositioning yourself as necessary.