Copper wall-mounted combination, gas fired boiler for central heating and domestic hot water production, fan assisted, room sealed compartment, electronic flame ignition and control (45 pages)
Copper wall-mounted combination, gas fired boiler for central heating and domestic hot water production, fan assisted, room sealed compartment, electronic flame ignition and control (68 pages)
Copper wall-mounted combination, gas fired boiler for central heating and domestic hot water production, fan assisted, room sealed compartment, electronic flame ignition and control (45 pages)
Wall-mounted gas fired, pre-mix condensing combination boiler (40 pages)
Summary of Contents for Ferroli Modena HE
Page 1
Ferroli Modena HE Century Design for 21 Century Life...
Page 2
Modena 80E or Modena 102. The new Ferroli Modena C HE is smaller, weighs less, has built-in frost protection and an IP protection rating of IPX5D. This allows direct replacement wherever the existing boiler is legitimately installed (i.e.
Page 3
BOILER REPLACEMENT: MODENA 80/102 TO MODENA C E Manual Handling When lifting take suitable safety precautions: keep your back straight, bend knees, do not turn your body, avoid bending forward or sideways and keep the load as close as possible to your body. Ideally seek assistance in lifting the boiler.
Page 4
BOILER REPLACEMENT: MODENA 80/102 TO MODENA C E 5. Ensure that all pipe connections are free, move the base of the boiler forward and lift the boiler off the hanging bracket tabs. Finally, unscrew the hanging bracket from the wall. Check that the wall surface is sound, flat and capable of supporting the weight of the boiler.
Page 5
BOILER REPLACEMENT: MODENA 80/102 TO MODENA C E 5. Lay the boiler on its back. Remove the front casing panel by undoing the two securing screws on the underside of the case. Ease the lower edge of the panel forward to clear the controls display and lift upwards off the frame.
Page 6
BOILER REPLACEMENT: MODENA 80/102 TO MODENA C E 9. It is suggested that where possible the existing Fig.8 pipe-work is cut back approximately 200mm - 300mm for ease of connecting the existing pipe-work to the new valves (Fig 8) Cut existing pipes back approx 200mm –...
Page 7
BOILER REPLACEMENT: MODENA 80/102 TO MODENA C E 11. Connect the temporary filling loop between the cold water inlet and the CH return pipe as Fig.11 close to the boiler as is practical Fig.11 Open the CH isolation valves; fill and vent the system and flush using a commissioning cleanser.
Page 8
BOILER REPLACEMENT: MODENA 80/102 TO MODENA C E 18. Commissioning the boiler: Fig.13 (See 3.3 of the Modena C HE Installation Instructions) Connect a manometer to the inlet test point of the gas valve (Fig.13) Set the boiler to operate at maximum by selecting ‘TEST MODE’...
Page 9
Ferroli Modena HE Century Design for 21 Century Life www.ferroli.co.uk 0843 479 0009 Ferroli Limited Lichfield Road Branston Industrial Estate Burton upon Trent Staffordshire DE14 3HD...
Need help?
Do you have a question about the Modena HE and is the answer not in the manual?
Questions and answers