Installation Checklist - Amana Top Freezer Owner's Manual

Table of Contents

Advertisement

Available languages

Available languages

Installation Checklist

This checklist is for personal records only.
Consumer Installer
Notes
Consumer's Signature
Doors
Handles are solidly attached to doors.
Handle side of door is
loaded with food.)
Doors seal completely to refrigerator cabinet.
Ice Maker
(some models)
Water supply to refrigerator is turned on.
Water leaks are not present at connection between household water supply and
refrigerator. (After 24 hours, consumer should check connection for water
leaks.)
Ice maker arm is in on position for ice production. (It may take up to 24 hours for
first harvest of ice.)
Leveling
Refrigerator is tilted
1
Toe grille is properly attached to refrigerator.
Product Literature
Owner's manual is reviewed including the following information.
• product registration card
• Fresh Food and Deepfreeze
• Chiller Fresh
system
• Garden Fresh
crispers
• normal operating sounds
Installer's Signature
1
/
" (3 mm) higher than hinge side. (Door lowers when
8
/
" (6 mm) from front to rear.
4
®
controls
Installer's Company Name/Phone Number
7
Date

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Upright freezer

Table of Contents