Installation Of Hot And Cold Water Line Fittings - Flowmatic FMR04-ZW Installation, Operation And Maintanance Manual

Zero waste reverse osmosis system
Table of Contents

Advertisement

Installation of hot and cold water supply line valves
F o r 3 / 8 " p l u mb i n g
Hand tighten brass nuts then apply 1/4 turn with a wrench.
Step 6
Turn off the hot and cold water supply to the faucet by turning the angle stop valves off.
Step 7
Remove water supply line at faucet to the angle stop valves.
Step 8
Attach the water supply line valves as illustrated in the drawings above.
Step 9
Re -attach the water supply line to the fittings attached to the angle stop valves.
To RO System
1/4" Compression Nut
Plastic Sleeve
Brass Insert
Angle Stop Valve
(not included)
1/2"M X 3/8"F X 1/4"Comp.
with needle valve
RO Tubes will be connected on page 6.
3/8"M X 1/2"F
Adapter
Rubber
Washer
5
F o r 1 / 2 " p l u mb i n g
1/4" Compression Nut
Plastic Sleeve Brass
Insert
Angle Stop Valve
(not included)

Advertisement

Table of Contents
loading

Table of Contents