3000 Series Overlays; Overlay / Frame Overlay Panel; Panel Preparation; Panel Installation - U-Line U-3018CLROL-00 Install Manual

Modular 3000 series 120v, 3018clr models
Hide thumbs Also See for U-3018CLROL-00:
Table of Contents

Advertisement

7 3000 Series Overlays

Overlay / Frame Overlay Panel

NOTICE
Due to differences in surrounding cabinetry the panel may
not perfectly align with door. The procedure below is
designed to provide a finished overlay panel that seamlessly
integrates with surrounding cabinetry.

Panel Preparation

A full overlay door panel completely covers the door frame and
provides a built-in appearance.
NOTICE
• The door panel must not weigh more than 20lbs.
• It is important to ensure that all drilled holes are drilled to
the correct depth in order to avoid splits in the wood
when hardware is installed.
• Appliance will need up to 34 1/2" to the under side of the
counter to leave room for leveling adjustments.
1. Cut the panels to the dimensions listed in the diagram below.
2. Optional: Stain or Finish panel to desired stain or color. Be sure to
closely follow the instructions provided by the manufacturer.
NOTICE
If finishing frame overlay, both sides of overlay must be
finished in order to prevent warping.
3. Optional: Install handles and hardware.

Panel Installation

1. Fully open door,
2. Starting at corner, pull gasket
away from door.
3. Continue to pull gasket free
from gasket channel.
4. Upon removal, lay gasket down
on a flat surface.
Overlay Panel Dimensions
Installation Guide
BACK SURFACE MUST HAVE AMPLE FLAT SURFACE
TO MOUNT OVERLAY PANEL FLAT AND WITHOUT
INTERFERANCE
17 1/2"
Solid Overlay
Ice Machines
3/4"
30"
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents