U-Line U-3018CLROL-00 Install Manual page 10

Modular 3000 series 120v, 3018clr models
Hide thumbs Also See for U-3018CLROL-00:
Table of Contents

Advertisement

NOTICE
Make certain the display cable remains securely seated in
the inner door channel, see below.
Inner
Display
Door Channel
Cable
5. The frame should be aligned with the outside edge (opposite the
hinge) and high enough to align with the highest point in the door.
Align Top Of Panel With Highest Point Of Door
NOTICE
Due to differences in floor construction or surrounding
cabinetry the frame may not sit flush with the top of the
door.
Frame
Align Frame
Against
Door Edge
First
Door
Installation Guide
6. Secure overlay to door
using clamps. A robust
tape may also be used.
U-Line recommends the
use of bar clamps to
securely clamp the
overlay to the door. If
using tape be certain the
tape will not damage
overlay finish upon
removal.
7. Using a 7/64" drill bit,
drill 6 pilot holes into
the wood panel
1/2" deep using the
holes in the door frame
as a guide.
8. Locate 6 of the #6x
1 1/2" screws provided
with your unit
9. Using a phillips
screwdriver, place one
screw into each of the 6
pilot holes and screw
down. Do not
overtighten screws.
10. Be sure the screws force
their way past the opening on the gasket channel and sit flush
against the bottom of the channel.
Overlay Panel
11. Remove clamps from door.
NOTICE
If frame requires additional adjustment after removing
clamps, slightly loosen each screw and adjust frame as
necessary. Tighten screws upon completion.
12. Starting at the corners, re-install the gasket into the gasket channel
in the frame. Make sure the gasket is fully seated, this may take
some force.
Ice Machines
Bar
Clamp
Door
Overlay
Panel / Frame
Bar
Clamp
Overlay Panel
8