(4) With the "Lo" knob of the manifold valve open, run
the vacuum pump. The operation time for the vacu-
um pump varies with tubing length and the capacity
of the pump. The following table shows the amount
of time for evacuation:
Table 6
Required time for evacuation when
26.4 gal/h (100 liter/h) vacuum pump is used
If tubing length is
less than 33 ft. (10 m)
10 min. or more
(5) With the vacuum pump still running, close the "Lo"
knob of the manifold valve. Then stop the vacuum
pump.
(6) With the hex wrench, turn the valve stem on the
narrow tube service valve counter-clockwise by
90 degrees (1/4 turn) for 10 seconds, and then turn
the stem clockwise to close it again. (Fig. 28)
Be sure to completely insert the hex
CAUTION
wrench before attempting to turn the valve.
(7) Leak test all joints at the tubing (both indoor and outdoors) with
soapy water. Bubbles indicate a leak. Tighten the joint more
when leaks, then check if there is no leak. Be sure to wipe off the
soap with a clean cloth.
(8) With the hex wrench, turn the wide tube service valve stem
counter-clockwise to fully open the valve.
(9) Turn the narrow tube service valve stem counter-clockwise to
fully open the valve.
(10) Loosen the vacuum hose connected to the wide tube service
port slightly to release the pressure. Then, remove the hose.
This may cause the refrigerant gas to
CAUTION
leak. In order to avoid this, take off the
hose quickly.
(11) Fasten the valve cap on the wide tube service port securely
with an adjustable wrench or box wrench. Next, mount the
valve cap on the service valve and tighten it to 170 lbs·in
(200 kgf·cm) with a torque wrench. This process is very
important to prevent gas from leaking from the system.
(12) Test run the air conditioner. (See next page.)
(13) While the air conditioner is running, apply liquid soap to
check for any gas leaks around the service valves or caps.
(14) If there is no leakage, stop the air conditioner.
(15) Wipe off the soap on the tubing.
This completes air purging with a vacuum pump and the air condi-
tioner is ready for actual operation.
If tubing length is
more than 33 ft. (10 m)
15 min. or more
NOTE
To prevent other refrigerants from being mistakenly
charged to units which use R410A, the size of the
charge port on the service valve is different from the
one for other refrigerant types. For servicing such as
recharging, the specified charging hose, manifold and
vacuum pump adapter (with reverse flow prevention)
for R410A must be used.
NOTE
The required time in Table 6 is calculated based on the
assumption that the ideal (or target) vacuum condition
is around 0.193 psi (10 mmHg abs.).
24
90° (1/4 turn)
Narrow tube
Hex wrench
Valve cap
Vacuum hose to manifold valve
Fig. 28
Wide tube

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs-ks18nb4uwCs-ks12nb41Cz-18bt1uCu-ks18nkuCu-ks18nkua

Table of Contents