Yamaha TT-R125(V) Owner's Service Manual page 606

Table of Contents

Advertisement

CHARGING SYSTEM (TT-R125E/TT-R125LWE)
2
W B
R
Y
1
1
W Sb
Y B
2
EC624000
COUPLERS AND LEADS CONNECTION
INSPECTION
1. Check:
Couplers and leads connection
G
Rust/dust/looseness/short-circuit →
Repair or replace.
CHARGING VOLTAGE INSPECTION
1. Start the engine.
2. Inspect:
Charging voltage
G
Out of specification → If no failure is
found in checking the source coil resis-
tance, replace the rectifier/regulator.
Tester (+) lead → Red lead 1
Tester (–) lead → Black lead 2
Charging
voltage
14.0 ~ 15.0 V at
5,000 r/min
3. Inspect:
Charging coil resistance
G
Out of specification → Replace.
Tester (+) lead → White lead 1
Tester (–) lead → Black lead 2
Charging coil
resistance
0.64 ~ 0.96 Ω at
20 ˚C (68 ˚F)
6 - 19
+
ELEC
Tester selector
position
DCV-20
Tester selector
position
Ω × 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents