Installing A New Battery Pack; Testing The New Battery Pack; Disposing Of Used Batteries - HP R1500 - UPS XR User Manual

Ups r1500 xr models user guide
Table of Contents

Advertisement

Battery Maintenance

Installing a New Battery Pack

To install a new battery pack, reverse the steps in "Removing the Battery Pack," in this
chapter.

Testing the New Battery Pack

After installing the new battery pack, press the Test/Alarm Reset button. For information on
initiating a self-test, refer to the section, "Initiating a Self-Test," in Chapter 2.
IMPORTANT: The UPS will not execute a self-test until the batteries are 90 percent charged.
If the installation has been successful, the Bad Battery/Low Battery LED is not illuminated.
If the installation has not been successful, the Bad Battery/Low Battery LED illuminates red.
If this occurs, remove and reinstall the battery pack, and check the battery terminal
connections. If the Bad Battery/Low Battery LED is still red, refer to Chapter 5,
"Troubleshooting."
IMPORTANT: The batteries charge to 90 percent of their capacity within less than 3 hours. Allow the
batteries to charge for 24 hours before using the UPS to supply backup power to devices. The load may
not be fully protected for 24 hours.

Disposing of Used Batteries

The spare battery kit includes the instructions and packaging required to return used batteries
to the appropriate location for disposal.
4-6
Do not dispose of used batteries with general office or household waste. Return
the used pack for proper disposal to either:
HP, authorized HP Partners, or their agents
A recycling center that meets all local environmental standards
HP Uninterruptible Power System R1500 XR Models User Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

R1500 xr series

Table of Contents