Download Print this page

Asus security system User Manual page 6

Hide thumbs

Advertisement

1 PORT DETAIL INSTALLATION PROCEDURE
STEP 1
For the final installation, determine where the
control box will be located. And then, Lock the
control box on the determined location with two
screws (4.5mmx12mm, You need to prepare a
Phillips screwdriver).
STEP 2
Plug the USB connectors of the Charging & security
cables and the power tip of the AC adaptor into
each corresponding port of the controller.
Turn the power on, and finish all the installation
job.

Advertisement

loading

  Related Manuals for Asus security system