Keston K130 Installation And Servicing Instructions page 11

Fan powered high efficiency condensing gas boiler
Table of Contents

Advertisement

WD52/0/1997
Boiler
Keston
2.7.2
Sealed Systems
Sealed systems must be designed in accordance with BS 5449 and BS 7074 Pt1.
A typical sealed system is shown in Figure 2.7.2. It must include :
(i)
(ii)
(iii)
(iv)
(v)
(vi)
All components of the system including the heat exchanger of the indirect cylinder
must be suitable for a working pressure of 3 bar and a temperature of 110
Care should be taken in making all connections that the risk of leakage is
minimised.
Installation & Servicing Instructions
Chapter 2 - Boiler Connections
Expansion
Pipe
Strainer
Rad. 2
Figure2.7.1 : Open Vented System Diagram
A safety valve fitted on the flow, adjacent to the boiler. It must be non
adjustable and preset to 3 bar. A drain pipe must be attached, at least as
big as the valve connection, and routed to drain in any area not
hazardous nor where it may be subject to freezing.
An expansion vessel complying with BS 4814 and sized in accordance
with the requirements of BS 5449 and BS 7074 Pt 1. The vessel must be
positioned on the inlet to the pump.
A filling point, in accordance with local water authority requirements.
A method of system make-up (automatic or manual), in accordance with
local water authority requirements.
There must be no permanent connection of mains water to the boiler
system.
The installation must be designed to work with flow temperatures of up to
o
110
C.
The Keston 130 Condensing Boiler
Expansion
Tank
Minimum
9ft Height
28mm
Minimum
Pump
Rad. 1
Valve
By-pass
Bal.
Valve
Valve
o
C.
Page : 8
Cylinder
L/S
Valve

Advertisement

Table of Contents
loading

Table of Contents