Page 1
® Intel RAID Smart Battery AXXRSBBU8 User’s Guide ® A Guide for Technically Qualified Assemblers of Intel Identified Subassemblies/Products Intel Order Number: G15580-003 ® Warranty Notice: Adding a battery onto an Intel RAID controller will limit the warranty of this product. Returns determined to be caused by battery installation damage, stripped screws, or other damage resulting from the battery installation will not be covered.
Page 2
® Information in this document is provided in connection with Intel products. No license, express or implied, by estoppel or otherwise, to any intellectual property rights is granted by this document. Except as provided in Intel's ® ® Terms and Conditions of Sale for such products, Intel...
Safety Information Important Safety Instructions Read all caution and safety statements in this document before performing any of the instructions. See also Intel Server Boards and Server Chassis Safety Information on the ® Intel Server Deployment Toolkit 2.0 CD and/or at http://www.intel.com/support/motherboards/server/sb/cs-010770.htm.
Take care to grip with, but not squeeze, the pliers or other tool you use to remove a jumper, or you may bend or break the pins on the board. ® Intel RAID Smart Battery AXXRSBBU8 User’s Guide...
® Installing the Intel RAID Controller in the Server System ..........14 Chapter 3: Monitoring Battery Backup ..............17 Monitoring the BBU with the Intel® RAID BIOS Configuration Utility ........17 ® Using Intel RAID Web Console 2 ..................18 Chapter 4: Replacing Battery Backup Units ............21 Disposing of Battery Backup Units ..................21...
Page 9
List of Figures ® Figure 1. Top and Bottom View of the Intel RAID Smart Battery AXXRSBBU8...... 3 Figure 2. Remote Extender Board..................... 4 ® Figure 3. Installing Directly on the Intel RAID Controller............7 Figure 4. Mounting the Battery on a RAID Controller..............8 Figure 5.
AC power outage or if the AC power cord is removed. ® A battery backup unit (BBU) protects the integrity of the cached data on Intel RAID Controllers by providing backup power if there is a complete AC power failure or a brief ®...
Figure 1 displays the top and bottom views of the ® Intel RAID Smart Battery AXXRSBBU8. The J1 connector (see letter “A” for the ® location of this connector) is used to directly connect to an Intel RAID Controller. The J2 connector (see letter “B”...
Figure 2. Remote Extender Board Remote Battery Connecting Cables ® A 20 inch 20-pin cable is provided in the battery kit to remotely connect the Intel RAID Smart Battery AXXRSBBU8 to the RAID controller, or to a REB which is mounted on the RAID controller.
RAID Smart Battery AXXRSBBU8 must charge for at least six hours during fast charge, under normal operating conditions. To protect your data, Intel recommends that you set the RAID Controller Write Policy to write-through until the battery unit is fully charged. When the battery unit is charged, you can change the Write Policy to write-back to take advantage of the performance improvements of data caching.
55° C. If the ambient temperature exceeds 45° C, the fast charge cycle will terminate prematurely, thus preventing the battery pack from reaching a fully charged state. Intel recommends mounting the battery remotely from the RAID controller when possible to provide additional cooling.
2. Make sure the three screws, and Phillips* screwdriver are easily accessible during the following steps. ® 3. Remove the protective metal cover from the battery connector on the Intel RAID Controller. ® 4. Align the battery for your specific RAID controller by placing the Intel...
Figure 4. Mounting the Battery on a RAID Controller ® 7. Attach the Intel RAID Smart Battery AXXRSBBU8 to the RAID controller using the three Phillips* (2-56) screws provided. Place the three screws from the RAID controller side. Caution: Center the screwdriver carefully to avoid stripping the screw head. Do not over-tighten the screws.
Setting up a Remote Connection to the RAID Controller ® To install the Intel RAID Smart Battery AXXRSBBU8 on the RAID Controller through the J2 Remote BBU connector, do the following:. ® 1. Ground yourself, and remove the Intel RAID Smart Battery AXXRSBBU8 from the package.
Figure 7. Connecting the Cables Connecting the Plastic Battery Holder to the Chassis ® The Intel RAID Smart Battery AXXRSBBU8 is designed for easy attachment to either ® an Intel pedestal or rack mount chassis. Complete the following instructions for your server.
Figure 8. Aligning Holder’s Tabs to the Chassis Clips 3. Slide the plastic battery holder toward the front of the system until the tabs engage with the clips in the chassis (Figure ® Intel RAID Smart Battery AXXRSBBU8 User’s Guide...
2. Align the tabs on the plastic battery holder with the clips on the chassis. 3. Slide the plastic battery holder toward the rear of the system until the tabs engage with the clips in the chassis (Figure 10). ® Intel RAID Smart Battery AXXRSBBU8 User’s Guide...
1. Align the RAID controller with the PCI Express* slot. 2. Press down gently, but firmly, to ensure that the RAID controller is properly seated in the slot. The bottom edge of the RAID controller must be flushed with the slot. ® Intel RAID Smart Battery AXXRSBBU8 User’s Guide...
RAID Smart Battery AXXRSBBU8 when you insert the RAID controller. Only press down on the top edge of the RAID controller. ® 3. Attach the cables, as needed, to the connectors on the Intel RAID controller. 4. Replace the chassis cover and reattach the power cord(s).
Multiple utilities are available to display and configure the BBU information, including the recharge count. When you replace a BBU, you should reset this counter to zero. Intel recommends that you replace the BBU once a year or after 500 recharge cycles, whichever comes first.
RAID BIOS Console ® Most of the battery module properties are view-only. In the lower right panel of the Intel RAID BIOS Console screen, there are two properties that can be changed. Although Intel recommends that you use the default settings for these options. The default settings for the two properties are: •...
If you enable automatic learn cycles, you can delay the start of the learn cycles for up to 168 hours (7 days). If you disable automatic learn cycles, you can start the learn cycles manually, and you can choose to receive a reminder to start a manual learn cycle. ® Intel RAID Smart Battery AXXRSBBU8 User’s Guide...
Replacing Battery Backup Units Intel recommends that you replace each BBU once in one year or after 500 recharging cycles, whichever comes first. The battery pack has one year warranty. After you install a new BBU, use one of the Intel configuration utilities to reset the battery recharge cycle counter to zero.
DRT ratings. Battery Life and Data Retention Time The Intel utilities display a counter showing the number of times a BBU has been recharged. When you replace a BBU, you should run the utility program and reset this ®...