Download Print this page

Ariston microGENUS II 24 MFFI Installation And Servicing Instructions page 43

Type c boilers
Hide thumbs Also See for microGENUS II 24 MFFI:

Advertisement

6.5.6 Removing the pressure gauge
1. Remove the U-clip "I1" (F
2. Lift the pressure gauge from the rear of the control
panel using a screwdriver (F
. 6.53)
IG
. 6.54-6.55).
IG
I1
F
. 6.53
IG
F
. 6.54
IG
F
. 6.55
IG
6.5.7 Removing the expansion vessel
1. Release nut "J1" (F
. 6.56);
IG
2. Remove back-nut "K1" (F
3. Remove the expansion vessel (F
J1
K1
. 6.57);
IG
. 6.58).
IG
F
. 6.56
IG
F
. 6.57
IG
F
. 6.58
IG

Advertisement

loading