GE 5800 Owner's Manual And Installation Instructions page 16

Zoneline - air conditioners
Hide thumbs Also See for 5800:
Table of Contents

Advertisement

REINSTALL JUNCTION BOX
4
• Reinstall the junction box by engaging the tab at the
lower rear, aligning the screw hole at the top and
driving the one screw until secure. Be sure that all
wire leads are inside the box and not pinched
between the box and the unit. The green insulated
ground wire from the unit MUST be connected to
the branch circuit ground wire.
Make all wire connections by using appropriate
UL-listed electrical connectors and techniques
(black to black, white to white and green to green).
POWER CONNECTION CHART
230/208 Volt
Power
Supply Kits
RAK3153
RAK3203
RAK3303*
265 Volt
Power
Supply Kits
RAK5172
RAK5202
RAK5302*
* Not recommended for use on 7000 BTUH units.
Installation Instructions
265 VOLT ELECTRICAL SUPPLY
Wall Plug
Configuration
Tandem
15 Amp Time Delay Fuse or Breaker
Perpendicular
20 Amp Time Delay Fuse or Breaker
Large Tandem
30 Amp Time Delay Fuse or Breaker
Wall Plug
Configuration
Does Not Apply
15 Amp Time Delay Fuse or Breaker
Does Not Apply
20 Amp Time Delay Fuse or Breaker
Does Not Apply
30 Amp Time Delay Fuse or Breaker
REINSTALL JUNCTION
5
BOX COVER
1 Carefully tuck all wires and
connections back inside the
junction box. Be sure there
are no loose connections or
stray uninsulated wires
exposed.
2 Place the junction box cover
in place. Replace the two
screws removed earlier and
tighten securely.
3 Discard the unused portion of the plug and
the cordset.
Circuit Protective Device
Circuit Protective Device
16
Heater Wattage
@ 230/208 Volts
2.55/2.09 KW
3.45/2.82 KW
5.00/4.10 KW
Heater Wattage
@ 265 Volts
2.55 KW
3.45 KW
5.0 KW

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zoneline 5800

Table of Contents