Commissioning Certificate

Certificate of COMMISSIONING for the
Address:
I/we being the competent person(s) responsible (as indicated by my/our signatures below) for the
commissioning of the fire alarm system, particulars of which are set out below, CERTIFY that the said
work for which I/we have been responsible complies to the best of my/our knowledge and belief with the
recommendations of Clause 39 of BS5839-1:2002, except for the variations, if any, stated in this certificate
Name (in block letters):
Signature:
For and on behalf of:
Address:
The extent of liability of the signatory is limited to the system described below.
Extent of the installation work covered by this certificate.
Variations from the recommendations of clause 39 of BS 5839-1:2002 (see clause 7)
All equipment operates correctly
Installation work is, as far as can be reasonably ascertained, of an acceptable standard
The entire system has been inspected and tested in accordance with the recommendations of 39.2.c
of BS 5839-1: 2002.
The system performs as required by the specifications prepared by:
Taking into account the guidance contained in section 3 of BS 5839-1: 2002, I/we have not
identified any obvious potential for an unacceptable rate of false alarms.
The documentation described in Clause 40 of BS 5839-1:2002 has been provided to the user
The following work should be completed before/after (delete as applicable) the system becomes operational
The following potential causes of false alarms should be considered at the time of the next service visit:
Before the system becomes operational, it should be soak tested in accordance with the recommendations
of Clause 35.2.6 of BS 5839-1:2002 for a period of:
required by the design specification, or the period recommended by the signatory to this certificate,
whichever period is the greatest, or delete if not applicable)
Approved Document No: GLT.MAN-106A
Issue: 2.00
Authorised: GH
Premier AD
Date: 16/07/2007
Fire Alarm System installed at:
Position:
Date:
Postcode:
(enter a period of 1 week, the period