Download Print this page

Kenmore 40" DUAL FUEL RANGE Installation Instructions Manual page 10

40" dual fuel range
Hide thumbs Also See for 40" DUAL FUEL RANGE:

Advertisement

Available languages

Available languages

Important
Safety
Warning
To reduce the risk of tipping of the range, the range
must be secured to the floor by properly installed anti-
tip brackets and screws packed with the range. Those
parts are located in a plastic bag in the oven. Failure to
install the anti-tip brackets will allow the range to tip
over if excessive weight is placed on an open door or if a
child climbs upon it. Serious injury might result from
spilled hot liquids or from the range itself.
Follow the instructions below to install the anti-tip
brackets.
If range is ever moved to a different location, the anti-
tip brackets must also be moved and installed with the
range. To check for proper installation, see step 5.
Tools Required:
5/16" (8 mm) Nutdriver or Flat Head Screwdriver
Adjustable Wrench
Electric Drill
3/16" (4.8 mm) Diameter Drill Bit
3/16" (4.8 mm) Diameter Masonry Drill Bit (if installing
in concrete)
Anti-Tip
Bracket
Installation
Brackets attach to the floor at the back of the range to
hold both rear leg levelers. When fastening to the floor,
be sure that screws do not penetrate electrical wiring or
plumbing. The screws provided will work in either wood
or concrete.
1.
Unfold paper template and place it flat on the floor
with the back and side edges positioned exactly
where the back and sides of range will be located
when installed. (Use the diagram in figure 13 to
locate brackets if template is not available.)
2.
Mark on the floor the location of the 4 mounting
holes (2 holes per bracket) shown on the template.
For easier installation, 3/16" (4.8 mm) diameter pilot
holes 1/2" (1.3 cm) deep can be drilled into the
floor.
3.
Remove template and place brackets on floor with
turned up flanges to the outside (see figure 13). Line
up holes in brackets with marks on floor and attach
with 4 screws provided (2 screws per bracket).
Brackets must be secured to solid floor. If attaching
to concrete floor, first drill 3/16" (4.8 mm) dia. pilot
holes using a masonry drill bit.
4.
Level range if necessary, by adjusting the 4 leveling
legs with a wrench. (See Figure 14 below.) A
minimum clearance of 1/8" (3.2 mm) is required
between the bottom of the range and the rear
leveling legs to allow room for the anti-tip brackets.
5.
Slide range into place making sure rear legs are
trapped by ends of brackets. Range may need to be
shifted slightly to one side as it is being pushed back
to allow rear legs to align with brackets.
6.
After installation, verify that the anti-tip bracket is
engaged. Open and remove drawer and check to
make sure the anti-tip bracket is engaged.
_Slide
Back
Anti-Tip Bracket
Sides of
range
Figure 13
Figure 14
10

Advertisement

loading

This manual is also suitable for:

Range