3-5. Prepare The Tubing; 3-6. Connect The Tubing - Panasonic U-72MF1U9 Installation Instructions Manual

3way vrf system air conditioner
Hide thumbs Also See for U-72MF1U9:
Table of Contents

Advertisement

3-5. Prepare the Tubing

Material: Use C1220 phosphorous deoxidized copper as described in JIS H3300, "Copper and Copper Alloy
Seamless Pipes and Tubes."
(For tubes that are ø1" (ø25.4 mm) or larger, use 1/2H material or H material. For all others use O material.)
Tubing size
Use the tubing size indicated in the table below.
When cutting the tubing, use a tube cutter, and be sure to remove any burrs.
(The same applies to distribution tubing (optional).)
When bending the tubes, bend each tube using a radius that is at least 4 times the outer diameter of the tube.
When bending, use sufficient care to avoid crushing or damaging the tube.
For flaring, use a flare tool, and be sure that flaring is performed correctly.
Use sufficient caution during preparation of the tubing. Seal the tube ends by
CAUTION
means of caps or taping to prevent dust, moisture, or other foreign substances
from entering the tubes.
Refrigerant tubing (Existing tubing can be used.)
Tubing size (mm)
Outer dia.
Thickness
ø1/4" (ø6.35)
t1/32" (t0.8)
ø3/8" (ø9.52)
t1/32" (t0.8)
ø1/2" (ø12.7)
t1/32" (t0.8)
ø5/8" (ø15.88)
t5/128" (t1.0)

3-6. Connect the Tubing

Use the supplied connector tubing. (See figure below.)
72 type (6-Ton)
4
3
2
1
1
2
3
4
96 type (8-Ton)
4
3
2
1
1
2
3
4
Refrigerant tube port
Use caulking, putty, or a similar material to fill any
gaps at the refrigerant tube port (
prevent rainwater, dust or foreign substances from
entering the unit.
* Perform this work even if the tubing is routed out
in a downward direction.
Outer dia.
Thickness
ø3/4" (ø19.05)
over t5/128" (t1.0)
ø7/8" (ø22.22)
t5/128" (t1.0)
ø1-1/8" (ø28.58)
t5/128" (t1.0)
ø1-3/8" (ø34.92)
over t3/64" (t1.1)
Refrigerant
Connection method
tubing
Suction tube
Brazed connection
Discharge tube
Brazed connection
Liquid tube
Brazed connection
Balance tube
Flared connection
Refrigerant
Connection method
tubing
Suction tube
Brazed connection
Discharge tube
Brazed connection
Liquid tube
Brazed connection
Balance tube
Flared connection
) in order to
Tubing routed out forward
26
Use supplied
connector tube?
No
No
No
No
Use supplied
connector tube?
Yes (ø3/4" → ø7/8")
Yes (ø5/8" → ø3/4")
No
No
Tubing
cover
Tubing routed out downward
Base plate

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents