Prepare The Opening - GE Advantium SCB1000 Installation Instructions Manual

120 built-in speedcook ovens
Hide thumbs Also See for Advantium SCB1000:
Table of Contents

Advertisement

mnstaJiation Preparation
PREPARE THE OPENING
The Advantium 120 can be installed in combination
with other GE/Monogram appliances. Always follow
each product's Installation Instructions to complete
the installation.
Single Advantium 120 Installation:
Order a 27" or 30" wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
27" or 30"
23-1/2"
17-1/2"
\\
\
Construct
Base
Min. 3/8"
_\ Plywood
Supported
by2x4
orlx2
Runners
all
Four Sides
• Always maintain 36-3/4" minimum height from the
floor to the cutout in any single or combined
installation.
• Allow 1-1/4" case trim overlap atthe top and 7/8"
overlap on the bottom and each side of the opening.
• Oven overlaps will conceal cut edges on all sides of
the opening.
When installed over a single oven or a warming
drawer, allow at least 2" between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 120 and the other appliance
overlaps.
0onstruct a solid oven floor of 3/8" min. thick plywood
supported by 2 x 4 runners on all sides.
• The support must be level and rigidly mounted, flush
with the bottom edge of the cutout.
PREPARE THE OPENING
(CONT.t
lastaHatioa over a GE/IVlenogram
Warming Drawer:
17-1/2"
36-3/4"
Min,
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported
by2
x 4or
/lx2
Runners
all
Four Sides
2" Min.
2x4
or2x2
Runners
or Solid
Bottom.
Must
Support
100 Ibs.
NOTE: Additional clearances between the cutouts may
be required. Check to be sure the oven supports above
the Warming Drawer location does not obstruct the
required hltefior depth and height. See Warming Drawer
installation instructions for details.

Advertisement

Table of Contents
loading

Table of Contents