Electrical Requirements - GE Advantium SCB1000 Installation Instructions Manual

120 built-in speedcook ovens
Hide thumbs Also See for Advantium SCB1000:
Table of Contents

Advertisement

JnstaJJation Preparation
ELECTRICAL
REQUIREMENTS
SingJe Advantiam
120 InstaJJation:
This product requires a 120 voJt, 60 Hz, 15 amp circuit
and draws 1.8 kiJowatts. This product must be connected
to a suppJy circuit of the proper vokage and frequency.
Wire size must conform to the requirements of the
National ElectdcaJ Code orthe prevailing IocaJ code for
this kilowatt rating.
The power supply cord and plug should be brought to a
separate 15 or 20 ampere branch circuit single
grounded receptacle. The outlet box should be located
within reach of the 48" power cord.
ELECTRICAL
LOCATION
Locate outlet box in the shaded area
t
9"
Install a recessed electrical outlet in the back wall of
the opening within 6" of either side and at least 9"
above the cutout floor.
iMPORTANT: (Please read carefully).
The power cord of this appliance is equipped with a
three-prong
(grounding) plug that mates with a standard
three-prong
grounding wall receptacle to minimize the
possibility of electric shock. The customer should have
the wall receptacle and circuit checked by a qualified
electrician to make sure the receptacle
is properly
grounded and has the correct polarity.
,Where
a standard two-prong wall receptacle
is
encountered, it is the personal responsibility
and
obligation of the customer to have it replaced with a
properly grounded three-prong wall receptacle.
Do not, under any circumstances,
cut or remove the third
(ground) prong from the power cord.
DO NOT USE AN EXTENSION CORD.
5

Advertisement

Table of Contents
loading

Table of Contents