Prepare The Opening - GE PSB9100DFBB Installation Instructions Manual

120v built-in speedcook ovens
Hide thumbs Also See for PSB9100DFBB:
Table of Contents

Advertisement

Available languages

Available languages

PREPARE THE OPENING

The Advantium 120 can be installed in combination
with other GE appliances. Always follow each
product's Installation Instructions to complete
the installation.
Single Advantium 120 Installation:
opening in a wall to the dimensions shown.
27
Min.
the floor to the cutout in any single or combined
installation.
opening.
of the opening.
When installed over a single oven or a warming
This separation will provide clearance for bottom
overlap of the Advantium 120 and the other
appliance overlaps.
flush with the bottom edge of the cutout.
Installation Preparation
Construct
Base
Plywood
Supported
Runners all
Four Sides
6
PREPARE THE OPENING
Installation over a GE Warming Drawer:
Min.
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
(CONT.)
Construct
Solid Bottom
Plywood
Supported
all Four Sides
or Solid
Bottom. Must
Support 100
lbs.

Advertisement

Table of Contents
loading

Table of Contents