Remove The Packaging - GE Advantium SCB1000 Installation Instructions Manual

120 built-in speedcook ovens
Hide thumbs Also See for Advantium SCB1000:
Table of Contents

Advertisement

Installation
Preparation
PREPARE THE OPENING
(CONT.)
Installation
over a GE/Monogram
Oven:
27" or 30"
23-1/2"
45-1/4"
Min.
17-1/2"
25-1/8"
Construct
Solid
Bottom
Min. 3/8"
Plywood
Supported
by2x4orl
x 2 Runners
all Four
Sides
2" Min.
Per Oven
Requirement
* If you are replacing a GE/Monogram electric double
oven with the combined installation of an Advantium
120 and a single oven, use the dimensions shown.
The middle rail separating the two openings may
need to be larger than the 2" minimum shown.
PREPARE THE OPENING
ICONT.)
InstaJJation
over a GE/Monogram
Oven and
Warming
Drawer:
Construct
27" or 30"
23-1/2"
Solid
Bottom
Min. 3/8"
Plywood
Supported
by2x4orl
x 2 Runners
all Four
Sides
- 2" Min.
Per Oven
Requirement
2" Min.
45-1/4"
/_x
9-1/4"
NOTE: Additional cJearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location does not
obstruct tile required interior depth and height. See
Warming Drawer installation instructions for details.
CAUTION: For personaR safety, the mounting surface
must be capable of supporting the cabinet load, in
addition to the added weight of this approximate 75
pound product, plus, additional oven loads of up to
50 pounds or a total weight of 125 pounds.
MmSEEN OA£[}E : Pour votre sOcurit6 personnelle, la
surface de montage doit _tre capable de supporter le
poids du cabinet, en plus du poids suppl_mentaire
du
produit, soit 34 kg, en plus du poids suppl_mentaire
du four pouvant aller jusqu'a 22,7 kg, ou un poids total
de 56,7 kg.
REMOVE THE PACKAGING
• Lift the oven out of the carton.
• Remove all packing material and tape.
• Open the door and remove parts box.
• Locate parts package containing mounting screws.

Advertisement

Table of Contents
loading

Table of Contents