Installation Preparation
PreparationWITHOUTan AccessoryStorage Drawer
PREPARE THE OPENING
The Advantium
120V can be installed in
combination
with other GE/Monogrom
oppliances.
AlwoLIs follow eoch product's
Installotion
Instructions
to complete
the installation.
Single Advantium
120V Installation:
Order a 30" wide single oven cobinet or cut
the opening in a wall to the dimensions
shown.
\\ \
\\\\
Construct
Base
Min. 3/8"
_Plyw00d
Supported
by2x40r
2 x 2 Runners
all Four Sides
• Allow 2-1/8" cose trim overlop on the sides,
1-1/16" overlop on the top ond 7/8" overlop
on the bottom of the opening for oll models.
• Oven overlaps will conceal cut edges on all sides
of the opening.
When instolled over o single oven or o warming
drower, allow ot least 2" between the two openings.
This separotion
will provide clearonce for bottom
overlap of the Advantium
120V and the other
applionce
overlaps.
Construct o solid oven floor of 3/8" min. thick plgwood
supported bg 2 x 4 or 2 x 2 runners on oll sides.
• The support
must be level and rigidly mounted,
flush with the bottom edge of the cutout.
PREPARE THE OPENING {cont.)
Installation
over a GE/Monogram
Warming
Drawer:
17-1/2"
23-1/2"
Construct
Solid Bottom
Min. 3/8"
Plywood
_
Supp0rted
by2x40r2x2
Runnersall
FourSides
2" Min.
(3" Recommended)
PerWarming
Drawer
Requirement
NOTE: Additionol
cleoronces
between the cutouts
mall be required. Check to be sure the oven supports
above the Warming
Drawer Iocotion do not obstruct
the required interior depth and height. See Warming
Drawer installation
instructions
for details.
Need help?
Do you have a question about the Advantium PSB1200 and is the answer not in the manual?