GE Advantium PSB9120 Installation Instructions Manual

120v built-in speekcook ovens
Hide thumbs Also See for Advantium PSB9120:

Advertisement

Advertisement

Table of Contents
loading

Summary of Contents for GE Advantium PSB9120

  • Page 2: Table Of Contents

    Safety Information BEFORE YOU BEGIN CONTENTS Design Information Read these instructions completely and carefully. Models Available ..............2 IMPORTANT Save these instructions Product Dimensions and Clearances ......4 for local inspector’s use. Tools and Parts Required ............4 Parts Supplied ................4 IMPORTANT Observe all governing codes Advance Planning ..............4 and ordinances.
  • Page 3 Información de seguridad ANTES DE COMENZAR Lea estas instrucciones por completo y con detenimiento. IMPORTANTE Guarde estas instrucciones para el uso de inspectores locales. IMPORTANTE Cumpla con todos los códigos y ordenanzas vigentes. Nota al instalador Asegúrese de dejar estas instrucciones con el Consumidor.
  • Page 4: Product Dimensions And Clearances

    Design Information PRODUCT DIMENSIONS AND CLEARANCES NOTE: Appearance will vary by model. 21-1/2 29-3/4 1-3/5 1-1/10 ADVANCE PLANNING TOOLS AND PARTS REQUIRED These ovens may be installed directly into a 30 wide (NOT SUPPLIED oven cabinet. #2 Phillips screwdriver Cutout dimensions are NOT the same for installation Hand-held drill with or without an accessory storage drawer.
  • Page 5: Installation Preparation

    Installation Preparation ELECTRICAL REQUIREMENTS Single Advantium 120 Installation: This product requires a 120-volt, 60 Hz, 15-amp circuit and draws 1.8 kilowatts. This product must be connected to a supply circuit of the proper voltage and frequency. National Electrical Code or the prevailing local code for this kilowatt rating.
  • Page 6 Accessory Storage Drawer PREPARE THE OPENING PREPARE THE OPENING (cont.) The Advantium 120V can be installed in Installation over a GE/Monogram combination with other GE/Monogram appliances. Warming Drawer: Always follow each product’s Installation 23-1/2 Instructions to complete the installation.
  • Page 7 Installation Preparation WITHOUT Preparation an Accessory Storage Drawer PREPARE THE OPENING (cont.) PREPARE THE OPENING (cont.) Installation over a GE/Monogram oven: Installation over a GE/Monogram Oven and Warming Drawer: 23-1/2 23-1/2 Construct Solid Construct Solid Bottom Min. Bottom Min. 3/8 Plywood...
  • Page 8 (3 Recommended) Drawer Requirement NOTE: Additional clearances between the cutouts GE/Monogram oven over another, use the may be required. Check to be sure the oven dimensions shown. The middle rail separating supports above the Warming Drawer location the two openings may need to be larger than do not obstruct the required interior depth the 2 minimum shown.
  • Page 9 (5-1/2 Recommended) PREPARE THE OPENING (cont.) Installation under a GE/Monogram 30 or 36 Cooktop or Countertop: Gas or electric cooktops may be installed over this oven. See cooktop installation instructions for the cutout size. See the label on top of the oven for approved cooktop models. This oven requires a separate, properly grounded 15-Amp, 120-Volt, 60Hz power supply.
  • Page 10: Preparing The Opening (Installation With An Accessory Storage Drawer)

    AN ACCESSORY STORAGE DRAWER FOR THIS MODEL. PREPARE THE OPENING (cont.) PREPARE THE OPENING (cont.) The Advantium 120V can be installed in Installation over a GE/Monogram combination with other GE/Monogram appliances. Warming Drawer: Always follow each product’s Installation 23-1/2 Instructions to complete the installation.
  • Page 11 MODEL ZSC1202 CANNOT BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER. SEE INSTALLATION PREPARATION WITHOUT AN ACCESSORY STORAGE DRAWER FOR THIS MODEL. PREPARE THE OPENING (cont.) PREPARE THE OPENING (cont.) Installation over a GE/Monogram Oven: Installation over a GE/Monogram Oven and Warming Drawer: 23-1/2 23-1/2 Construct Solid Bottom Min.
  • Page 12 Drawer Requirement *PSB9120 model only NOTE: Additional clearances between the cutouts GE/Monogram oven over another, use the may be required. Check to be sure the oven dimensions shown. The middle rail separating supports above the Warming Drawer location the two openings may need to be larger than do not obstruct the required interior depth the 2 minimum shown.
  • Page 13: An Accessory Storage Drawer

    4-1/2 minimum shown. 4-1/2 Min. (5-1/2 Recommended) PREPARE THE OPENING (cont.) Installation under a GE Profile 30 or 36 Cooktop or Countertop: Gas or electric cooktops may be installed 1-1/2 Min. over this oven. See cooktop installation Cooktop instructions for the cutout size.
  • Page 14: Installation Instructions

    Installation Instructions 1 REMOVE THE PACKAGING AND PARTS by handle or conduit. Two people are required to lift this oven. Rack CAUTION: If installing the Advantium Owner’s 120V Oven below 36 , you must use the plastic Manual bottom trim due to burn risk to children. The plastic trim acts as insulation and will help prevent burns to children from hot surfaces.
  • Page 15: Step 2, Door Trim Removal For Above

    Installation Instructions 2 DOOR TRIM REMOVAL FOR ABOVE 3 SLIDE THE OVEN INTO THE CUTOUT 36 INSTALLATION ONLY CAUTION: Two people are required to If installing the Advantium 120V Oven above 36 lift the oven into the opening. Grasp the bottom from the floor, you may remove the plastic trim at front and rear.
  • Page 16: Step 4, Install Bottom Trim

    Installation Instructions 4 INSTALL BOTTOM TRIM 6 INSTALL MOUNTING SCREWS CAUTION: If installing the Advantium 120V Oven below 36 , you must use the plastic bottom trim due to burn risk to children. The plastic trim acts as insulation and will help prevent burns to children from hot surfaces.
  • Page 17: Assembly Instructions

    GE Consumer & Industrial Appliances Assembly Instructions Advantium Built-In Accessory Storage Drawer ® JX2200, JX2201, ZX2201 BEFORE YOU BEGIN MODELS AVAILABLE Profile Models: Read these instructions completely and carefully. JX2200BB–Black Read the Installation Instructions for the Advantium JX2201SS–Stainless Steel 120V or 240V oven completely and carefully for cutout dimensions and step-by-step instructions.
  • Page 18 ASSEMBLY TO ADVANTIUM BUILT-IN SPEEDCOOK OVEN 1 REMOVE PACKAGING AND PARTS 3 ASSEMBLING THE OVEN TO DRAWER Place storage drawer on a surface with the front of drawer hanging over the edge of the surface. Not placing the front edge of drawer over the edge of the surface may result in damage to the drawer since the front edge of drawer hangs below the bottom...
  • Page 19 ASSEMBLY TO ADVANTIUM BUILT-IN SPEEDCOOK OVEN ASSEMBLING THE OVEN TO DRAWER (cont.) Remove the front two bottom screws on each side of the oven and the top center screw on each side of the storage drawer. D Place the side supports into the tabs on the drawer and secure using the screws supplied and the screws removed in Step C.
  • Page 20 NOTE: While performing installations described in this book, GE Appliances & Lighting safety glasses or goggles should be worn. Appliances NOTE: Product improvement is a continuing endeavor at General Electric Company General Electric. Therefore, materials, appearance and Louisville, KY 40225 specifications are subject to change without notice.

This manual is also suitable for:

Advantium zsc1202Advantium zsc1201

Table of Contents