Mixer Circuit With Buffer Cylinder, Domestic Hot Water Cylinder And External Passive Cooling (Hydraulic Plan 10) - Vaillant geoTHERM VWS Installation Instructions Manual

Hide thumbs Also See for geoTHERM VWS:
Table of Contents

Advertisement

6.6.6 Mixer circuit with buffer cylinder, domestic
hot water cylinder and external passive
cooling (hydraulic plan 10)
a
Caution!
Risk of damage!
The electrical auxiliary heating must be
protected on the customer side by a non
self-resetting thermal cut-out that pro-
vides all-pole disconnection.
h
Note
Hydraulic plan 10 is only suitable for
geoTHERM VWS x 0/2 (brine water).
The dimensioning of the cooling heat ex-
changer and brine mixer valve must be
carried out on the customer side.
Fig. 6.12 Hydraulic plan 10
Installation instructions geoTHERM VWS/VWW 0020051574_01
Electrical installation 6
The regulated underfloor heating circuits are operated
by the external heating circuit pump from the buffer
cylinder via a mixer. Flow temperature sensor VF2 is in-
stalled downstream of the diverter valve in the heating
flow (necessary for cooling function).
The heat pump responds to a demand for heat from the
buffer cylinder.
The brine pump is only included with VWS.
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Geotherm vww

Table of Contents