4 Sequence of operations during installation
4.2

Required minimum gaps/assembly clearances

min 5
min 5
Fig. 4.1
Distances during installation (dimensions in mm)
The combination of units must be installed on a flat
vertical wall which is large enough for the shift load
storage tank with mounted combi boiler, including the
required minimum clearances and space allowances for
installation. The required minimum clearances during
installation can be taken from Fig. 4.1.
The minimum clearances and installation clearances are
shown on the installation template. They are:
– 5 mm on each side of the unit combination
– 180 mm underneath the unit combination
– 165 mm above the boiler if using a flue pipe of 100 mm
outside diameter
– 246 mm above the boiler if using a flue pipe of 125 mm
outside diameter
– 500 mm in front of the unit combination to permit
easy access for service work.
Please note that, under the unit combination, there
should be adequate space to position the drain pipes via
a drain funnel. The drain must be visible!
Note!
h
If the boiler is to be installed in a timber framed
building, it sohuld be fitted in accordance with
IGE/UP/7/1998 „Guide for gas installations in
timber framed dwellings".
4.2.1
Selecting the location for the shift load
storage tank and combination boiler
The installation location for the shift load storage tank
and the combi boiler should be selected so that:
– there is adequate room around the boiler for service
and maintenance work
– the flue pipe of the combi boiler can operate properly
i.e. the location of the terminal of the flue pipe is
located in accordance with these instructions and the
flue pipe is installed in accordance with the installation
instructions for the flue pipe provided
– all the required pipework including the pressure relief
valve and the condensate drain can be fitted.
20
Further information concerning the installation location
of the combi boiler can be found in the Section
"Installation Location".
4.3
First cut through the two plastic straps when unpacking
min 500
the units. Then open the box and lift the top section of
the polystyrene off. Lift the box upwards.
Note!
h
Please take care that the white surface of the
units is not damaged.
4.4
Use the template provided for the installation (see
Fig. 4.2).
The template shows the following:
the position of the fixing holes for the hanging bracket,
– the position of the connections.
– the position of the hole in the wall for the flue pipe.
• line the installation template up vertically and fix the
template to the wall.
• mark the position of the fixing holes for the hanging
bracket,
• drill 2 holes Ø 10 mm in the wall for the hanging
bracket.
h
Note!
Please take the total weight of the unit
combination and the load capacity of the wall
into account.
If necessary drill alternative fixing holes. If
necessary use alternative fixing materials.

Unpacking the equipment

Using the installation template

ecoTEC plus 937 installation and maintenance manual