Replacing The Primary Heat Exchanger - Vaillant ecoTEC plus 937 Instructions For Installation And Servicing

Wall hung room sealed fan assisted condensing boiler with 15 litre shift load power store
Hide thumbs Also See for ecoTEC plus 937:
Table of Contents

Advertisement

9 Replacing components
9.5

Replacing the primary heat exchanger

d
Danger!
Before replacing components ensure that the
safety instructions from Section 9.1 are
observed.
• Disconnect the appliance from the mains as described
in Chapter 9.1, and close the gas isolation valve in the
gas supply pipe.
• Close the isolation valves in the flow and return pipes
and drain the water out of the combi boiler.
• Remove the compact thermo module as described
under 7.2.1.
• Remove the expansion tank as described under 9.4.
• Pull off the condensate pipe which runs from the
primary heat-exchanger to the siphon.
1
2
4
Fig. 9.5 Replacing the primary heat exchanger
• Remove the clamps (1) and (2) and pull off the flow
and return hoses from the primary heat-exchanger.
• Unscrew the four screws (3) on the holder of the
primary heat-exchanger.
60
3
Fig. 9.6 Holder for the primary heat-exchanger
• Pull the plug connection (2) of the thermal fuse off
• Unscrew the three screws (3) on the holder of the
• Turn the holder to the side around the rivet (1), pull
• Mount the new primary heat exchanger
• Fit a new burner door seal kit.
• Fit the burner module.
• Continue to replace in the reverse order.
h
a
• Filling and vent the combi boiler as required.
• After completion of the work check the system for gas
the primary heat-exchanger.
primary heat-exchanger.
the primary heat exchanger downwards to the right
and remove it from the appliance.
Note
A new burner door seal kit must be fitted every
time the burner door is removed.
Caution!
Danger of damage to the primary heat-
exchanger!
Do not release or tighten the four screws
(Fig. 9.5, Item 4).
Caution!
Insert the „O"-rings for the flow and return
hoses on the primary heat-exchanger using a
suitable lubricant.
Push the flow and return connections up to the
stop in the primary heat-exchanger and make
sure that the seating of the clamps on the flow
and return hoses are correct (see Fig. 9.5).
leaks and carry out a function test (see Section 7.8).
ecoTEC plus 937 installation and maintenance manual
1
2
3

Advertisement

Table of Contents
loading

Table of Contents