Required Minimum Gaps/Assembly Clearances; Selecting The Location For The Shift Load Storage Tank And Combination Boiler; Unpacking The Equipment; Using The Installation Template - Vaillant ecoTEC plus 937 Instructions And Maintenance Instructions

Gas fired wall hung high efficiency boiler with layered storage tank
Hide thumbs Also See for ecoTEC plus 937:
Table of Contents

Advertisement

4.2

Required minimum gaps/assembly clearances

min 5
min 5
Fig. 4.1
Distances during installation (dimensions in mm)
The combination of units must be installed on a flat
vertical wall which is large enough for the shift load
storage tank with mounted combi boiler, including the
required minimum clearances and space allowances for
installation. The required minimum clearances during
installation can be taken from Fig. 4.1.
The minimum clearances and installation clearances are
shown on the installation template. They are:
– 5 mm on each side of the unit combination
– 180 mm underneath the unit combination
– 165 mm above the boiler if using a flue pipe of 100 mm
outside diameter
– 246 mm above the boiler if using a flue pipe of
125 mm outside diameter
– 500 mm in front of the unit combination to permit
easy access for service work.
Please note that, under the unit combination, there
should be adequate space to position the drain pipes via
a drain funnel. The drain must be visible!
Note
h
If the boiler is to be installed in a timber framed
building, it should be fitted in accordance with
IG/UP/7 Edition 2 „Gas installations in timber
framed and light steel framed buildings".
4.2.1
Selecting the location for the shift load
storage tank and combination boiler
The installation location for the shift load storage tank
and the combi boiler should be selected so that:
– there is adequate room around the boiler for service
and maintenance work
– the flue pipe of the combi boiler can operate properly
i.e. the location of the terminal of the flue pipe is
located in accordance with these instructions and the
flue pipe is installed in accordance with the installation
instructions for the flue pipe provided
– all the required pipework including the pressure relief
valve and the condensate drain can be fitted.
Installation and maintenance instructions ecoTEC plus 0020031552_03
Sequence of operations during installation 4
Further information concerning the installation location
of the combi boiler can be found in the Section "Installa-
tion Location".
4.3
First cut through the two plastic straps when unpacking
min 500
the units. Then open the box and lift the top section of
the polystyrene off. Lift the box upwards.
h
Note
Please take care that the white surface of the
units is not damaged.
4.4
Fig. 4.2 Assembly template

Unpacking the equipment

Using the installation template

80/125
(Art.-Nr. 303210)
(Art.-Nr. 303910)
60/100
25
A
A
A
5
450
80/125
60/100
A
A
5
19