Testing The Fuses - UNI-T UT70C Operating Manual

Table of Contents

Advertisement

Model UT70C: OPERATING MANUAL
Maintenance (2)
B. Testing the Fuses
Warning
To avoid electrical shock or personal injury, remove
the test leads and any input signals before replacing
the battery or fuse.
To prevent damage or injury, install ONLY replacement
fuses with identical amperage, voltage, and speed
ratings.
To test the fuse:
1.
Set the rotary switch to
pressing
2.
Plug a test lead into the terminal
the probe tip to the 10A or mA terminal.
l If the Meter beeps, the fuse is good.
l If the display shows
again.
l If the display shows any other value, have the
Meter serviced and contact your dealer
immediately.
If the Meter does not work while the fuse is all right, send
it to your dealer for repair.
.
, replace the fuse and test
42
and select
by
V Hz and touch

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents