Foundation; Horizontal Units; Ductwork - Trane Precedent TSCSeries Installation And Maintenance Manual

Packaged rooftop air conditioners - electric/electric, 3 – 10 tons – 60 hz
Table of Contents

Advertisement

Table 2.
Factory installed options (fiops)/accessory net weights (lbs)
Economizer
Electric Heaters
Hinged Doors
Manual Outside Air Damper
Motorized Outside Air Damper
Novar Control
Oversized Motor
Powered Convenience Outlet
Powered Exhaust
Reheat Coil
Roof Curb
Smoke Detector, Supply
Smoke Detector, Return
Stainless Steel Heat Exchanger
Through the Base Electrical
Unit Mounted Circuit Breaker
Unit Mounted Disconnect
(c)
460V IDM
(a) Weights for options not listed are <5 lbs.
(b) Net weight should be added to unit weight when ordering factory-installed accessories.
(c) Apply weight with all 460V 17 SEER Two-Stage Cooling units.

Foundation

Horizontal Units

If the unit is installed at ground level, elevate it above the
snow line. Provide concrete footings at each support
location with a "full perimeter" support structure or a slab
foundation for support. Refer to
operating and point loading weights when constructing a
footing foundation.
If anchoring is required, anchor the unit to the slab using
hold down bolts or isolators. Isolators should be installed
to minimize the transmission of vibrations into the
building.
For rooftop applications, ensure the roof is strong enough
to support the combined unit and support structural
weight. Refer to
Table 1, p. 20
weights. If anchoring is required, anchor the unit to the
roof with hold-down bolts or isolators.
Check with a roofing contractor for proper waterproofing
procedures.
RT-SVX22J-EN
26
15
10
16
20
8
5
38
40
15
61
5
7
4
8
5
5
29
Table 1, p. 20
for the unit's
for the unit operating
(a),(b)
(continued)
36
36
30
30
12
12
26
26
30
30
8
8
8
8
38
38
40
80
25
78
78
5
5
7
7
6
6
13
13
5
5
5
5
29
-

Ductwork

Figure 16, p. 21
to
Figure 18, p. 22
return air openings as viewed from the rear of the unit.
Figure 16. 3-5 ton standard efficiency units & 3 ton high
efficiency units - Horizontal supply & return
air openings
Installation
36
36
40
40
12
12
26
26
30
30
8
8
38
50
80
80
53
78
89
5
5
7
7
6
6
13
13
5
5
5
5
-
-
illustrate the supply and
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents