Installation - Teledyne 3290 Operating Instructions Manual

Percent oxygen analyzer
Hide thumbs Also See for 3290:
Table of Contents

Advertisement

Percent Oxygen Analyzer

Installation

Installation of the analyzer includes:
1. Unpacking the system.
2. Mounting the Control Unit, external sample block, and oxygen
sensor.
3. Making the electrical connections.
4. Making the gas connections.
5. Testing the installation.
CAUTION:
READ THIS CHAPTER IN ITS ENTIRETY BEFORE
INSTALLING THE UNITS.
FOR INDOOR USE ONLY.
THE SAMPLE MUST BE FREE OF ENTRAINED
SOLIDS OR WATER.
THE SENSOR ELECTROLYTE IS CAUSTIC. DO NOT
ATTEMPT TO OPEN IT. LEAKING OR EXHAUSTED
CELLS SHOULD BE DISPOSED OF IN
ACCORDANCE WITH LOCAL REGULATIONS. REFER
TO THE MATERIAL SAFETY DATA SHEET IN THE
APPENDIX OR ADDENDUM.
ANY DAMAGE OR SCARRING OF THE DELICATE
PERMEABLE MEMBRANE ON THE SENSING END
OF THE CELL WILL REQUIRE CELL REPLACEMENT.
PREVENT CONTACT WITH MEMBRANE BY ANY
SOLID OBJECT.
Teledyne Analytical Instruments
Installation
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents