Contents; Unpacking And Checking The Delivery - Siemens SICLOCK TC100 Operating Instructions Manual

Plant central clock
Table of Contents

Advertisement

Operation planning
4.3

Unpacking and checking the delivery

The device is completely assembled, tested and packed in the factory, and has
no internal transport locks.
If there are large temperature differences between the means of transport and the
unpacking site, we recommend leaving the device in its transport packaging to
avoid harmful condensation.
Procedure
Please check the packaging material for transport damage upon delivery.
If any transport damage is present at the time of delivery, lodge a complaint
with the responsible shipping company. Have the shipper confirm the trans-
port damage immediately.
Unpack the device.
Keep the packaging material in case you have to transport the device again.
Notice
The packaging protects the device during transport and storage. Transport the
device only in its original packaging!
Please keep the accompanying documentation in a safe place. You will need
the documentation when you start up the device for the first time.
Check the package contents for completeness and any visible transport
damage. Check for completeness using the enclosed "Contents of Delivery"
list.
Notify the responsible delivery service immediately if the packages contents
are incomplete or damaged.
Warning
Ensure that a damaged device is neither inadvertently installed nor brought into
operation.
4-2
Siemens AG 2010 All Rights Reserved
®
SICLOCK
TC100 Operating Instructions

Advertisement

Table of Contents
loading

Table of Contents