Vent Location; Fitting Top Space+Wall Clip - Rinnai RHFE-431WTA Owner's Operation And Installation Manual

Energysaver gas direct vent wall furnace
Hide thumbs Also See for RHFE-431WTA:
Table of Contents

Advertisement

VENT LOCATION

FLUE MANIFOLD POSITION
Center of hole for flue manifold can be drilled
anywhere within the shaded area. (To avoid studs,
etc.)
FOR WEATHERBOARD WALLS DRILL THROUGH
CENTER OF WEATHER BOARD FROM OUTSIDE,
THEN DRILL FROM INSIDE THROUGH PLASTER-
BOARD.
11"
(280mm)
Flue Hole
(217mm)
Before drilling the flue hole, check for water and gas
pipes as well as electric cables. Use a 3 1/8"
(80mm) drill for hole through wall.
WALL MOUNTING BRACKETS
Place top back spacer in position. Mark the position
of the top edge of the top space on the wall. Move
the heater away from the wall. Mark center lines
1 1/8" (30mm) down from the top edge mark, and
1 9/16" (40mm) From the left and right hand sides of
the top spacer. Attach wall brackets at the marked
position.
Cavity Opening
8 9/16"
FITTING TOP SPACER + WALL CLIP
Tighten all screws.
SECURE HEATER TO WALL
Replace top spacer, clipping the spacer into the wall
brackets at the same time as attaching it to the
heater. Secure top spacer with the screws provided.
THE HEATER IS NOW SECURED TO THE WALL.
Replace fan filter.
– 15 –
Top spacer
Spacer bracket
Top spacer
Spacer bracket
Wall bracket
Spacer

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rhfe-556wta

Table of Contents