4-5. Connecting Input Power

Model
1.5 kVA 110 Volt
2.5 kVA 220 Volt

5-1. Controls

OM-715 Page 10
1
2
Input Conductor
Size (AWG)
No. 10
No. 10
SECTION 5 − OPERATION
1
2
Return To Table Of Contents
5
3
4
Or
Fuse/Circuit Breaker
Size In Amperes
30
30
Y Input power supply wiring
and receptacle must meet
National Electrical Code and
all other code requirements.
Operate spot welder from a sepa-
rately fused or circuit breaker pro-
tected circuit, and use correct size
input conductors.
1
Rating Label
2
Cord
3
Parallel Plug On 110 Volts AC
Models
4
Tandem Plug On 220 Volts
AC Models
Do not cut ground terminal off plug.
5
Grounded Receptacle
Connect
plug
to
matching
grounded receptacle.
Ref. ST-800 156
1
Hand Lever
Use lever to open and close tongs.
Close the hand lever during the
welding process to compress the
material between the tips. To adjust
tong pressure, see Section 4-3.
2
Start Switch
Use switch to turn weld current On
and Off. Move switch sideways in
either direction to start weld current.
Release switch to stop weld cur-
rent.
ST-145 104-A