Assembly And Installation Of; Double Deck Casters - Sunfire SDG-1 Installation And Operation Manual

Gas convection ovens
Hide thumbs Also See for SDG-1:
Table of Contents

Advertisement

INSTALLATION Continued

Assembly and Installation of

Double Deck Casters

Verify all parts are present before beginning assembly.
Parts List
ITEM
QTY
1.
4
Caster Pads Assembly
2.
2
Heavy Duty Caster Without Brake
3.
2
Heavy Duty Caster With Brake
1
Bag Of Hardware
8
3/8" – 16 X 3/4" Bolts
8
3/8" Flat Washer
8
1/4" Hex Type B Sheet Metal Screws
8
Split Ring Lock Washers
Part # 1844030 (03/19/10)
DESCRIPTION
1
2
Tools Required for Assembly
1. 9/16" Wrench
2. 3/8" Wrench
3. 1" Wrench
Assembly
1. Raise unit or lay it on its left side.
2. Attach each caster pad (1) with two 3/8" bolts and flat
washers and two 1/4" hex type "B" sheet metal screws and
lock washers.
3. Screw the heavy duty casters with brakes (2) into the
front casters pads and the heavy duty casters with out
brakes (3) into the rear caster pads.
4. Make sure all bolts and screws are tight.
5. Stand the unit up.
6. Move the unit into its desired location.
7. Level the oven using a 1" wrench to adjust the casters.
1
1
1
2
3
3
Page 7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sdg-2

Table of Contents