Final Inspection & Start-Up Checklist - Friedrich SS08 Installation And Operation Manual

Table of Contents

Advertisement

Final Inspection & Start-up Checklist
NOTE:
This is a warm weather appliance
Condensation is normal
Frosting
Noises
40
Heat pumps operate differently
1.
2.
Control Panel Battery Change Procedure
Figure 45
USE HAND TOOLS
DO NOT OVER TIGHTEN
1. USE HAND TOOLS WHEN INSTALLING AND
REMOVING FRONT PANEL.
DO NOT OVERTIGHTEN SCREWS.
2. DISCONNECT POWER AND FOLLOW ALL
LABELED WARNINGS WHEN FRONT PANEL
IS REMOVED.
Figure 46
FRR010

Advertisement

Table of Contents
loading

Table of Contents