Column Lock Handle; Table Installation; Head Assembly; Chuck And Arbor Installation - Jet JDP-15M Operating Instructions And Parts Manual

Walter meier
Table of Contents

Advertisement

Figure 4

Column Lock Handle

Referring to Figure 5:
Thread the column lock handle (D) into the table
bracket (E).
Figure 5

Table Installation

Referring to Figure 6:
1. Place the table (A) on the bracket (B).
2. Tighten the table lock handle (C).
Figure 6

Head Assembly

Referring to Figure 7:
1. With the aid of a second person, carefully lift
the head onto the column top and slide it
down into position
The head assembly is heavy! Use care when
lifting onto the column!
2. Rotate head assembly until sides of the
pulley cover are parallel with the sides of the
base.
3. Tighten two setscrews (A) with a 5mm hex
wrench (provided) until they are snug.
4. Install three downfeed handles (B) into the
downfeed hub (C).

Chuck and Arbor Installation

Referring to Figure 8:
1. Disconnect machine from power source.
2. Thoroughly clean entire arbor and inside of
chuck with a soft rag and solvent. Any
grease or residue in these areas can cause
the pieces to separate and create a safety
hazard as well as damage to the tool.
3. Slide arbor up into spindle.
4. Firmly push chuck by hand onto taper of
arbor.
5. Make sure chuck jaws are opened all the
way until they are inside chuck body. Use a
few taps from a rubber mallet, or a hammer
and a block of wood, against the bottom of
the chuck to seat the chuck securely onto
the arbor.
9
Figure 7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jdp-15mf

Table of Contents