Download Print this page

GE GSC22KGRCBB Owner's Manual And Installation page 32

Profile side by side models 23, 25, 26, 27 and 29

Advertisement

Available languages

Available languages

Installation
Instructions
INSTALLING THE WATER LINE (CONT.)
[] FASTEN THE SHUTOFF VALVE
Fasten
the shutoff
valve
to the cold water
pipe with
the pipe clamp.
Pipe Clamp
Saddle-Type
Shutoff
Valve
,)
Vertical Cold Water Pipe
NOTE: Commonwealth
of Massachusetts
Plumbing
Codes 248CMR
shall
be adhered
to. Saddle
valves
are illegal
and use is not
permitted
in Massachusetts.
Consult
with
your
licensed
plumber.
[]
TIGHTEN
THE PIPE CLAMP
Tighten
the clamp
screws
until
the sealing
washer
begins
to swell.
NOTE:
Do not overtighten
or you
may
crush
the tubing.
Pipe Clamp
Washer
Inlet End
Clamp
Screw
[]
ROUTE THE TUBING
Route the tubing
between
the cold water
line and the refrigerator.
Route the tubing
through
a hole drilled
in
the wall
or floor
(behind
the refrigerator
or
adjacent
base cabinet)
as close
to the wall
as possible.
NOTE:
Be sure there
is sufficient
extra
tubing
(about
8' [2.4 m] coiled
into 3 turns
of about
10" [25 cm] diameter)
to allow
the
refrigerator
to move
out from
the wall
after
installation.
32
[]
CONNECT
THE TUBING
TO THE VALVE
Place the compression
nut and ferrule
(sleeve)
for copper
tubing
onto
the end
of the tubing
and connect
it to the
shutoff
valve.
Make sure the tubing
is fully
inserted
into the valve.
Tighten
the compression
nut securely.
For plastic
tubing
from
a GE
SmartConnect
_MRefrigerator
Tubing
kit,
insert
the molded
end of the tubing
into
the shutoff
valve and tighten
compression
nut until
it is hand tight,
then
tighten
one
additional
turn with
a wrench.
Overtightening
may cause
leaks.
Saddle*Type
Shutoff
Valve
Compression
Nut
"\'4
SmartConnect
_'
Tubing
Packing
Nut
Outlet
Valve
Ferrule
(sleeve)
NOTE: Commonwealth
of Massachusetts
Plumbing
Codes 248CMR
shall be adhered
to. Saddle
valves
are illegal
and use is not
permitted
in Massachusetts.
Consult
with
your
licensed
plumber.
[]
FLUSH OUT THE TUBING
Turn the main
water
supply on and flush
out the tubing
until the water
is clear.
Shut the water
off at the water
valve after
about one quart (1 liter) of water
has been
flushed
through
the tubing.
I
To complete
the installation
of the refrigerator,
go back to Step 1 in Installing
the Refrigerator.
I

Hide quick links:

Advertisement

loading