Storage Tank And Startup - GE PNRQ15FBL Owner's Manual And Installation

Reverse osmosis
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
STORAGE TANK AND STARTUP
STORAGE TANK INSTALLATION
1.
2.
.
Remove
the protective
cap from
the top
of the tank.
Apply
2-3 wraps
of thread
tape,
in a clockwise
direction,
to the
tank threads.
Install
the push-to-connect
fittings
on the
threaded
fitting
on the tank as shown.
4.
Storage
tank
Push the 3/8" red banded
tubing
from
the
Reverse
Osmosis
System
into the fitting
on the storage
tank.
SYSTEM STARTUP PROCEDURE
A_^|
|-i-=r_R,
LLt.p/'_U/IUI_I:
If installing the unit in
new construction,
ensure that house plumbing
is flushed thoroughly
before opening the water
supply valve.
1.
Check that all tubing
connections
are
secure.
2.
Turn on the Feed Water
Supply
Valve.
3.
Check all connection
points
for leaks.
4.
Follow
the Sanitization
procedures
on
page
19.
5.
After
sanitization
is complete,
reinstall
prefilter,
postfilter
and Reverse
Osmosis
cartridges.
6.
Membrane
contains
a food
grade
preservative.
Allow
the system
to fill the
tank, then
drain
it completely
four times
before
using
the water
from
the system.
7.
Recheck
all water
connection
points
a few
days later to check for small
leaks.
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pnrq15f

Table of Contents