Install The Header Bracket - Craftsman 139.53525SRT Owner's Manual

1/2 hp
Hide thumbs Also See for 139.53525SRT:
Table of Contents

Advertisement

Installation Step 2
Install the Header
Bracket
You can attach the header bracket either to the
wall above the garage door, or to the ceiling,
Follow the instructions which will work best for
your particular requirements.
Fasten the Header Bracket to the Wall
• Center the bracket on the vertical guideline with
the bottom edge of the bracket on the horizontal
line as shown (with the arrow pointing toward the
ceiling).
• Mark either set of bracket holes (do not use the
holes designated for ceiling mount). Drill 3/16" pilot
holes and fasten the bracket securely to a structural
support with the hardware provided.
__ Header
_
Wall
//
/
Lag Screws
5/16"x18x1-7/8"
Wail
Mounting
Holes
2x4
Structural
Support
Highest
Point of Travel
(of Garage Door)
Door
Spring
Door
Vertical
Center
Line
The nail hole is for positioning
only You must use lag screws to
mount the header bracket.
Optional
Wall Mounting
Holes
Hardware Shown Actual Size
'>
5/16"-18xl
-7/8"
Fasten the Header Bracket to the Ceiling
• Extend the vertical guideline onto the ceiling as
shown.
• Center the bracket on the vertical mark, no more
than 6" from the wall. Make sure the arrow is
pointing toward the wall. The bracket can be
mounted flush against the ceiling when clearance
is minimal.
• Mark holes designated for ceiling mount only. Drill
3/16" pilot holes and fasten bracket securely to a
structural support with the hardware provided.
Ceiling Mounting Holes
Door
Spring
>_
t _
Screws
5/16"x18x1-7/8"
The nail hote is for positioning
only.
You must use lag screws to mount
the header bracket.
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

139.53636srt139.53627srt139.53640srt139.53641srt

Table of Contents