1.1 GENERAL Unauthorized personnel shall not open the unit since there components inside. Qualified ALTINEX service personnel, or their authorized perform all service. 1.2 INSTALLATION For best results, place the TNP100-HB Interconnect Box in a dry area away from dust and moisture.
Any changes or modifications to the unit not expressly approved by ALTINEX, Inc. could void the user’s authority to operate the equipment. ABOUT YOUR TNP100-HB The TNP100-HB is designed for installation into a conference room table.
INSTALLATION Step 1. Cut an opening into the table’s surface . Refer to diagram 5 on page 7 of the manual for table cutout requirements. Note: The table can be 3 inches or thinner in thickness. Always confirm dimensions before cutting to insure that specifications have not changed.
Answer The unit will not stay open. Replace the gas spring. Call ALTINEX for service information. The unit is 4.5 inches deep maximum below the table; to this dimension add about 2.5 inches for cable clearance.
Make sure that no cable or power cord is damaged or pinched. If there has been damage, then do not use the TNP100-HB unit. Immediately contact the ALTINEX Customer Service Department to have the unit repaired.
, or accident. 12.2 RETURN POLICY It is very important to ALTINEX that you receive all products that you have ordered and that this product meets your expectations. In the unlikely event that an ALTINEX product needs to be...
Need help?
Do you have a question about the Tilt 'N Plug Interconnect Box TNP100-HB and is the answer not in the manual?
Questions and answers