Installation Requirements - Friedrich UE10 Installation & Operation Manual

115/230 volts thru-the-wall series
Table of Contents

Advertisement

Installation
Remove packing sheet from the back of the sleeve, and
packing corner and blue tape from the air conditioner.
INSTALLATION REQUIREMENTS
If you use an existing wall sleeve, you should measure
its dimensions.
Install the new air conditioner
according to these
installation instructions
to achieve the best performance.
All wall sleeves used to mount the new air conditioner
must be in good structural condition and have a rear grille
to securely attach the new air conditioner.
(FIG. 1)
Installing the FRIEDRICH
USC sleeve ensures optimal
performance
of the new air conditioner.
(FIG. 2)
19-2//32"
(499 mm)
Air Conditioner
/3/32"
mm)
8"(458mr'n)
FIG. 1
INSTALLATION
HARDWARE
s
2 Size options
ITEM
NAME OF PARTS
i Q'TY
_1_
PLASTIC GRILLE
1
HORIZONTAL
INSULATION
STRIPS
2
AROUND
INSULATION
STRIPS
2
(49
SUPPORT BLOCK
2
BAFFLE
1
_6_
TRIM FRAME
2
SHIM
2
_8_
PLASTIC NUTS AND WASHER SCREWS i
4
<9_
GRILLE REAR
1
25-7/s"
_{656
mm)
(394mm}
aluminum metal grill
FRIEDRICH
Wall Sleeve
FIG. 2
ELECTRICAL
SERVICE
Check your available electrical service. The power
supply available must be the same as that shown
on the unit nameplate (found on left side of cabinet).
All models
are equipped
with a 3-prong
service
plug
to provide
proper
service
and safe positive
grounding.
Do not change
plug in any way.
Do not
use an adapter
plug.
If your present
wall outlet
does
not match
your plug, call a qualified
electrician
to
make the necessary
corrections.
SAVE CARTON
for storage
and this OWNER'S
MANUAL
for future
reference.
The carton
is the best way to store
unit
during
winter
or when not in use.
To avoid risk of personal injury, property damage,
or product damage due to the weight of this
device and sharp edges that may be exposed:
• Air conditioners covered in this manual pose an
excessive weight hazard. Two or more people
are needed to move and install the unit.
To prevent injuryor strain, use proper lifting and
carrying techniques when moving unit.
• Carefully inspect location where air conditioner
will be installed. Be sure itwill support the weight
of the unit over an extended period of time.
• Handle air conditioner with care. Wear
protective gloves whenever lifting or carrying the
unit. AVOID the sharp metal fins of front and
rear coils.
• Make sure air conditioner does not fall during
installation.
REQUIRED TOOLS:
• Tight
Fitting
gloves
• Standard
screwdriver
• Phillips
screwdriver
• Pliers
• Sharp
knife
• 3/8-inch
open end
wrench
or adjustable
wrench
• 1/4-inch
hex socket
and ratchet
• Tape measure
• Electric
drill
• 1/4-inch
drill bit

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ue08Ue12

Table of Contents