Top Rail Installation - Soleus Air GB-WAC-06SE-C Operating Instructions Manual

Electronic window air conditioner
Table of Contents

Advertisement

TOP RAIL INSTALLATION

NOTE: Top Rail and the side Sliding Panels are offset to provide the proper pitch to the rear of (5/16"). This is necessary
for proper condensation utilization and drainage. If you are not using the side panels, the rear pitch must still be main-
tained.
1. Remove the backing from the top mounting rail seal strip and attach the seal strip to the bottom of the top rail. Align
along the front edge.
2.
Attach the top rail onto the top of the outer case using the four 2/5" screws.
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gb-wac-06ese-cGb-wac-08ese-c

Table of Contents